Top Menu

Archive | Electrical

Stunning Kitchen Transformation – From 1990 to 2015!

JW Takes a Naperville Kitchen from 1990 to 2015

November 24, 2014

Our long-time clients in Naperville, IL were tired of their old, dated 1990 kitchen with grainy, oak cabinets and dark interiors. They approached JW for design ideas and remodeling needs.

We suggested keeping the old cabinets which were in very good condition and recomended painting the cabinets a beautiful Ivory color, adding a range hood and cool LED lights to open up the space and bring in much-needed light, and update the backsplash. Here is the before kitchen.

Oak Kitchen Remodel in Chicago - JW Construction and Design Services, ILOak Kitchen Before - JW Construction and Design Services, IL

Week 1 – We removed the cabinet doors to be sanded, primed, filled, and painted at our workshop while we began the process by sanding and priming the cabinet boxes. Next we added wood fillers to remove the grains and finally painted. This process was repeated multiple times to completely get rid of the grains and achieve a gorgeous finish. Next, we added beautiful crown molding to the cabinets, and installed a sleek stainless steel range hood.

We finished off Week 1 by adding cool LED lights under and above the cabinets.

Here are some pics of the kitchen remodel in progress:

Oak cabinets Painted White - JW Construction & Design Services

Oak Kitchen Painted While - JW Construction & Design Services, IL

LED Lights in a Kitchen Remodel - JW Construction & Design Services

AKDY Stainless Steel Range Hood - JW Construction & Design Services, IL

It’s Week 2 of the kitchen remodel and we are ready to tear out the old tiles and the 4″ granite backsplash and install brand new glass tiles. Once the tiles are installed, we will paint the kitchen walls and family room and unveil the brand new look. Here are some pics of the kitchen as we begin the tile installation.

Tile Installation Chicago, IL - JW Construction & Design Services

Tile tear out in Naperville, IL - JW Construction & Design Services

Tile Installation in Chicago Area - JW Construction & Design Services, IL

Week 3 – The new glass mosaic tile from The Tile Shop has been installed, walls have been painted and the new kitchen is ready to be unveiled. The homeowners are ecstatic and are ready to celebrate the holidays in the “brand new” kitchen! Here is their new kitchen:

Kitchen Remodeling in Chicago Area - JW Construction & Design Services

White Kitchen Remodel in Naperville, IL - JW Construction & Design Services

Please follow and like us:
1

Bathroom Sanctuary for a Naperville, IL Couple

JW to Build a Bathroom Sanctuary for a Naperville, IL Couple

April 27th, 2013

This is a new project that JW Construction and Design is taking on. It’s a master bathroom for Dave & Phyllis of Naperville, IL where we’ll be removing the tub, the shower, and the toilet and relocating the toilet, tub, and increasing the shower for new spa-like bathroom. We will be installing super slope can lights in the ceiling – one that will be directly centered above the master shower and above the toilet. We will also be installing an ultra-quiet exhaust fan. A new Airjet tub will be installed in approximately the same location as the old tub.

Bathroom Remodeling Naperville, IL - JW Construction & Design ServicesBathroom Remodeling Chicago area - JW Construction & Design Services

April 30th, 2013

We have removed one vanity for our new location of the toilet. The bathroom will now only have one vanity. Travertine tile will be installed throughout the shower, the main floor, the tub deck, and backsplash the walls. Here is a picture of the 12X20 inch floor tile installation work-in-progress.  We will post more pictures of our progress later this week.​

Bathroom Tile Installation - JW Construction & Design Services

 

 

 

May 8, 2013

Just a quick update of last week from Dave & Phyllis of Naperville. Their shower panliner was installed with the rough plumbing consisting of showerhead, one handheld, and two body sprays. The tub was cracked and we’re waiting on the tub, so we built the tub deck and installed permabase on the shower walls and main floor. In the shower, we seal-proofed all the permabase on the walls by siliconing all the seam lines and protecting it by painting Proshield on the permabase. We installed 12X20 inch tiles on the main floor in a brick pattern and a porcelain 13X 13 inch tile straight pattern on the shower walls. On the main water wall, we installed a picture frame around all the plumbing fixtures. Updated photos of this week’s work will be posted soon.

May 14, 2013

The bathroom remodel is progressing really well. We’ve finished tile installation on the shower walls, shower floor, tub surround, and the bathroom floor. Here are some photos of the bathroom progress.

Shower Tile Installation  - JW Construction & Design Services

 

Water Feature Wall in Naperville, il - JW Construction & Design ServicesJune 15, 2013

We are ready to unveil the new bathroom that we built for Dave & Phyllis. The homeowners are ecstatic and so are we.

 

Master Bath Remodel in Naperville, IL - JW Construction & Design Services

 

Shower Tile Installation in Naperville, IL - JW Construction & Design Services

 

Plumbing Services Naperville - JW Construction & Design Services

 

Please follow and like us:
0

Powered by WordPress. Designed by WooThemes