New Master Bath Remodel for George & Megan Folsom in Naperville, IL
August 26, 2014
We’re remodeling George & Megan’s master bathroom which will be complete tear-out including drywall from the walls and the ceiling. We are relocating the shower where the master whirlpool tub once was. There will be no tub now in the master bathroom. We’re expanding the vanity from wall to wall where there was just a small double vanity next to the shower. The new vanity will have included his and her tower. We will be retiling the main floor and the shower, including the shower floor.
Here are a couple of shots of the master bathroom on Day 1 of the project:
September 1, 2014 – We installed three super slope can lights to add lighting to the shower and the toilet area. As of now the drywall has been installed and now we’re in the process of mudding the drywall. Next week, we will be installing all the tiles.
Here’s a shot of the bathroom remodel-in-progress and the can lights installed!
Watch this space for more updates!
October 15, 2014
The Folsom bath remodel is all done. We built walk-in shower in place of the old whirlpool tub and installed a beautiful wall-to-wall vanity. Gorgeous porcelain tiles were installed on the shower walls and floor, accented by glass and stone listello and shower niche. We painted the walls in a soothing green and installed floor tiles to complement the beautiful wall color and shower tiles. The homeowners, needless to say, are thrilled with their brand new master bath!
Here are the finished pic – Enjoy!