Stunning Kitchen Transformation – From 1990 to 2015!

JW Takes a Naperville Kitchen from 1990 to 2015

November 24, 2014

Our long-time clients in Naperville, IL were tired of their old, dated 1990 kitchen with grainy, oak cabinets and dark interiors. They approached JW for design ideas and remodeling needs.

We suggested keeping the old cabinets which were in very good condition and recomended painting the cabinets a beautiful Ivory color, adding a range hood and cool LED lights to open up the space and bring in much-needed light, and update the backsplash. Here is the before kitchen.

Oak Kitchen Remodel in Chicago - JW Construction and Design Services, ILOak Kitchen Before - JW Construction and Design Services, IL

Week 1 – We removed the cabinet doors to be sanded, primed, filled, and painted at our workshop while we began the process by sanding and priming the cabinet boxes. Next we added wood fillers to remove the grains and finally painted. This process was repeated multiple times to completely get rid of the grains and achieve a gorgeous finish. Next, we added beautiful crown molding to the cabinets, and installed a sleek stainless steel range hood.

We finished off Week 1 by adding cool LED lights under and above the cabinets.

Here are some pics of the kitchen remodel in progress:

Oak cabinets Painted White - JW Construction & Design Services

Oak Kitchen Painted While - JW Construction & Design Services, IL

LED Lights in a Kitchen Remodel - JW Construction & Design Services

AKDY Stainless Steel Range Hood - JW Construction & Design Services, IL

It’s Week 2 of the kitchen remodel and we are ready to tear out the old tiles and the 4″ granite backsplash and install brand new glass tiles. Once the tiles are installed, we will paint the kitchen walls and family room and unveil the brand new look. Here are some pics of the kitchen as we begin the tile installation.

Tile Installation Chicago, IL - JW Construction & Design Services

Tile tear out in Naperville, IL - JW Construction & Design Services

Tile Installation in Chicago Area - JW Construction & Design Services, IL

Week 3 – The new glass mosaic tile from The Tile Shop has been installed, walls have been painted and the new kitchen is ready to be unveiled. The homeowners are ecstatic and are ready to celebrate the holidays in the “brand new” kitchen! Here is their new kitchen:

Kitchen Remodeling in Chicago Area - JW Construction & Design Services

White Kitchen Remodel in Naperville, IL - JW Construction & Design Services

Please follow and like us:
1

Beautiful Master Bath Remodel in Naperville, IL

New Master Bath Remodel for George & Megan Folsom in Naperville, IL

August 26, 2014

We’re remodeling George & Megan’s master bathroom which will be complete tear-out including drywall from the walls and the ceiling. We are relocating the shower where the master whirlpool tub once was. There will be no tub now in the master bathroom. We’re expanding the vanity from wall to wall where there was just a small double vanity next to the shower. The new vanity will have included his and her tower. We will be retiling the main floor and the shower, including the shower floor.

Here are a couple of shots of the master bathroom on Day 1 of the project:

Master Bath Remodel in Naperville, IL - JW Construction & Design ServiceMaster Bathroom Remodel in Progress - JW Construction & Design Services

September 1, 2014 – We installed three super slope can lights to add lighting to the shower and the toilet area. As of now the drywall has been installed and now we’re in the process of mudding the drywall. Next week, we will be installing all the tiles.

Here’s a shot of the bathroom remodel-in-progress and the can lights installed!

Can Light Install in Naperville Bathroom Remodel - JW Construction & Design Services

Watch this space for more updates!

October 15, 2014

The Folsom bath remodel is all done. We built walk-in shower in place of the old whirlpool tub and installed a beautiful wall-to-wall vanity. Gorgeous porcelain tiles were installed on the shower walls and floor, accented by glass and stone listello and shower niche. We painted the walls in a soothing  green and installed floor tiles to complement the beautiful wall color and shower tiles. The homeowners, needless to say, are thrilled with their brand new master bath!

Here are the finished pic – Enjoy!

Bathroom Remodeling in Naperville, IL - JW Construction & Design Services

A Gorgeous Master Bathrooom in Chicago, IL - JW Construction & Design Services

Beautiful wall-to-wall vanity in a Bathroom Remodel in Naperville, IL - JW Constrution & Design Services

A stunning travertine shower with half wall and glass & stone niche in Naperville, IL - JW Construction &Design

 

Please follow and like us:
0

Master Bathroom Suite Remodel in Naperville, IL

Master Bathroom Remodel for Sue & Bob Klein of Naperville, IL

January 3, 2014

We began a complete tear out only leaving the bathtub and the drywall. We also have removed the pine doors from the internal bathroom walkin closets and the main bathroom pine door for future installation of oak doors with new oak casing, baseboard, and crown molding. This is the progres of day 1 after the tear out and clean up.

Naperville, IL Bathroom Remodeling - JW Construction & Design ServicesChicago bathroom remodel before pics - JW Construction & Design Services

Day 2

Today we installed all the rough electrical for the new design and bathroom layout including the warm wire to heat the future tiled floor and we also installed the pro-level over the warm wire at the end of the day before we left to make sure the floor was 100% level and all the warm wire was embedded 100% within the pro-level.

Heated Bathroom Floors Installation in Chicago - JW Construction & Design Services

Day 3

We roughed in the plumbing for the shower, durock-ed shower walls and bath tub area and began the main floor tile installation.

Day 4,

We continued the tile installation on the main floor and grouted and poured the shower base floor for future tile that will be installed on the shower floor.

Day 5, 6 & 7

We continued to tile and grout the tub area and the shower. We installed custom cabinetry provided by Stonebridge designs and installed granite on the cabinets along with the center tower on top of the granite countertop. We drilled the holed for the vessel sinks and single faucet installations along with installing the vessels and the faucets. We installed the mirrors and wall sconces above the mirrors. we also installed the new plumbing fixtures on the bathtub and shower along with installing the toilet.

Naperville Bathroom Remodel in Progress - JW Construction & Design services

Chicago Bathroom Remodel in Progress - JW Construction & Design Services

Day 10

we patched, primed and painted the ceiling and walls along with staining all the new oak doors, basebpoard, casing, and shoe and polyurethane.

Basketweave Tile Installation in Naperville - JW Construction & Design Services

Bathroom Remodeling in Naperville - JW Construction & Design Services

Day 12

We introduced the kleins to their new master suite and they are already talking about their other two bathrooms. once we are done replacing their roof this summer.

Shower Tile Installation Chicago - JW Construction & Design Services

Granite Open Bench in Naperville Shower - JW Construction & Design Services

Vanity with Vessel Sink in a Chicago Bathroom - JW Construction & Design Services

Shower Tile Installation Chicago - JW Construction & Design Services

Please follow and like us:
0

Master Bathroom Remodel in Downers Grove, IL

Master Bathroom Remodel with Bells & Whistles in Downers Grove, IL

October 15, 2013

Today, we started a master bathroom remodel for Terri & JT Waite. We were referred to them by their friends – our existing clients. We will be removing all the current tiles, vanity, the mirrors, enlarging the shower, installing a new bathtub, new vanity with granite tops along with beaitiful new tiles & plumbing fixtures. We will also be installing warm wires throughout the main floors of the bathroom.

Here’s a picture of the tear-out.

Downers Grove Bathroom Remodeling - JW Construction & Design Servces

October 17, 2013

Today, we’re over at the Waite’s – we will be installingthe rough plumbing for the shower that will include two showerheads, one hand-held with a slide bar and 3-body sprays. We will also be installing a brand-new air-jetted bathtub. We will be pouring the shower floor, installing warm wires on the main floor, and pro-sealing over the warm wire. We will be ready for tile installation for tomorrow morning.

This is what the bathroom looked like when we started the work today:

Bathroom Remodeling in Downers Grove, IL - JW Construction & Design Services

October 25, 2013

Sometimes, problems occur in a remodeling project. Over at the Waite’s project, during the installation of the drywall, a screw went into one of the water lines. Mr. Waite woke up at 1AM to go to the bathroom and heard water dripping and found out that water was leaking through the ceiling on the first floor all the way to the basement. He called the owner of JW Construction & Design at 1:09 AM. Mr Waite lives in Downers Grove, IL and Jay, Willans, the owner of JW Construction & Design, in Naperville. By 1:25 AM, Jay arrived at Mr. Waite’s front door, and oversaw all the damage that was created by the water damage.

The water was shut off, holes were put in the drywall to release the water in the ceiling & walls. Water remained shut off until 7AM and water was shortly turned back on once the crew arrived at 7AM at the Waite’s residence and fixed the hole in the copper waterline.

Here are a few water damage pics from the basement & dining room, which had to be repainted to repair the water damage:

Bathroom Remodeling in Downers Grove, IL - JW Construction & Design Services

House Painting Services Downers Grove - JW Construction & Design Services  House Painting Services in Downers Grove, IL - JW Construction & Design Services

November 2, 201

As of today’s date, all the drywall that was removed from the water damage has been installed and we’re currently in the process of priming all of the new drywall as we have our crew tiling the master bathroom. Here’s a pic of the bathroom remodel in-progress:

Stay tuned in as we get close to finishing the Waite’s master bath remodel.

November 22, 2013

The Waites’ bathroom has come a long way. The shower has been tiled in beautiful travertine with a stone mosaic border. Top of the line water features, including two showerheads, one hand-held with a slide bar and 3-body sprays have been installed. Here are a couple of pics of the shower:

Downers Grove Bathroom Remodeling - JW Construction & Design ServicesBathroom Remodeling in Downers Grove, IL - JW Construction & Design Services

 

Please follow and like us:
0

Gorgeous Slate-Like Floor Tile Install

Slate-Like Tile Installation in Foyer & Powder Room

September 16th, 2013

JW completed a one-day floor tile installation for Jim of Naperville, IL. Jim had originally picked slate tiles for his foyer from Flooring Decor. However, due to the heavy traffic flows in the foyer area, he chaged it to a beautiful slate-looking procelain tile – a heavier dutu product.

We helped him design the 45 degree installation design to accomodate the perfect look for the area. We competed the installation in 1 day, using a speed-set product. We were able to grout and seal in 1day as well. The job was completed in 7 hours, with 2 guys working on the project. Total labor cost? $660.

Here are the pics from the project:

Tile Floor Install Chicago, IL - JW Construction & Design ServicesFloor Tile Installation, Naperville, IL - JW Construction & Design Services

Please follow and like us:
0

Spa Bathroom in Naperville, IL (Beautiful ‘After’ Pics!)

JW to build a Spa-like Master Bathroom in Naperville, IL

August 29, 2013

We’ve started work on Dan & Candice Richardson’s master bathroom. We will be removing all of the tiles throughout the bathroom. we will be removing and installing both vanities – one on each side of the tub. We will be installing travertine tiles throughout the master bathroom.

We will be enlarging the size of the sower, both in width & height, adding can lights in the cathedral ceiling, one each on side of the bath skylights and inside the shower as well. We will also install new plumbing in the shower to accomodate the homeowner’s desires for a spa-like bathroom.

Here are a couple of pictures of day 1 of tear-out.

bathroom remodelinG Chicago - JW Construction & Design ServicesNaperville Bathroom Remodel - JW Construction & Design Services

September 15, 2013

Today, we enlarged the shower size, by removing a vacant wall. We had found that there was a laundry shute in the vacant area. The Richardsons were OK with us removing the shute completely, which gave us the ability to expand the shower an extra 2 ft. and we removed the soffit which gave us an extra foot and a half of headroom. We installed two 4″ mini shower cans and we installed LED in the cans to increase te brigtness of the shower.

On the primary wall of the shower, we framed out a shower niche, roughly a foot and a half by 3 ft. After installing new rough plumbing fictures, we closed off the shower with permabase & waterproofed the shower prior to tile installation.

September 30, 2013

The Richardsons had picked out light walnut bucak polished travertine tile for the shower walls with the tub deck and surround along with a larger sized light walnut bucak for the floor. We used a glass mosaic for a linear inlay around the tub area and full sheet for the back of the shower niche.

October 15, 2013

We are back at the Richardsons for the finishing touches of their bathroom remodeling project. We got dark cherry cabinets installed with granite countertops, new light fictures on each side of the mirror and we purchased new mirror frames to go around the existing mirrors to give it a brand new look. We will be posting pictures of the new bathroom soon.

November 5, 2013

We’re finally at the Richardson residence to take photos of their “new” master bathroom. Dan and Candice have now decided to remodel their hall bathroom. We’re now in the process of going over the fine details of the material tat is going to be installed. Stay tuned in as we start blogging the Richardsons’ hall bathroom remodeling project.

Enjoy the pics!

Master Bathroom Remodel in Naperville, IL - JW Construction & Design ServicesShower Tile Installation in Naperville, IL - JW Construction & Design Services

Tile Installation in Naperville, IL - JW Construction & Design Services

Bathroom Remodeling in Chicago, IL - JW Construction & Design Services

Electrical in Naperville, IL - JW Construction & Design Services

 

Please follow and like us:
0

Bathroom Sanctuary for a Naperville, IL Couple

JW to Build a Bathroom Sanctuary for a Naperville, IL Couple

April 27th, 2013

This is a new project that JW Construction and Design is taking on. It’s a master bathroom for Dave & Phyllis of Naperville, IL where we’ll be removing the tub, the shower, and the toilet and relocating the toilet, tub, and increasing the shower for new spa-like bathroom. We will be installing super slope can lights in the ceiling – one that will be directly centered above the master shower and above the toilet. We will also be installing an ultra-quiet exhaust fan. A new Airjet tub will be installed in approximately the same location as the old tub.

Bathroom Remodeling Naperville, IL - JW Construction & Design ServicesBathroom Remodeling Chicago area - JW Construction & Design Services

April 30th, 2013

We have removed one vanity for our new location of the toilet. The bathroom will now only have one vanity. Travertine tile will be installed throughout the shower, the main floor, the tub deck, and backsplash the walls. Here is a picture of the 12X20 inch floor tile installation work-in-progress.  We will post more pictures of our progress later this week.​

Bathroom Tile Installation - JW Construction & Design Services

 

 

 

May 8, 2013

Just a quick update of last week from Dave & Phyllis of Naperville. Their shower panliner was installed with the rough plumbing consisting of showerhead, one handheld, and two body sprays. The tub was cracked and we’re waiting on the tub, so we built the tub deck and installed permabase on the shower walls and main floor. In the shower, we seal-proofed all the permabase on the walls by siliconing all the seam lines and protecting it by painting Proshield on the permabase. We installed 12X20 inch tiles on the main floor in a brick pattern and a porcelain 13X 13 inch tile straight pattern on the shower walls. On the main water wall, we installed a picture frame around all the plumbing fixtures. Updated photos of this week’s work will be posted soon.

May 14, 2013

The bathroom remodel is progressing really well. We’ve finished tile installation on the shower walls, shower floor, tub surround, and the bathroom floor. Here are some photos of the bathroom progress.

Shower Tile Installation  - JW Construction & Design Services

 

Water Feature Wall in Naperville, il - JW Construction & Design ServicesJune 15, 2013

We are ready to unveil the new bathroom that we built for Dave & Phyllis. The homeowners are ecstatic and so are we.

 

Master Bath Remodel in Naperville, IL - JW Construction & Design Services

 

Shower Tile Installation in Naperville, IL - JW Construction & Design Services

 

Plumbing Services Naperville - JW Construction & Design Services

 

Please follow and like us:
0

Striking Noir Travertine Hall Bathroom Remodel

Striking Noir Travertine Hall Bathroom Remodel for Existing Clients

April 1, 2013

7:30 AM – We are back again at Eric & Debbie Gustafson’s house. We did a complete kitchen remodel for them last year that came out amazing (Read about that Naperville kitchen remodeling project and view before-after pictures). We are now in the upstairs hall bath. We will remove everything today and be installing a new tub, shower valve and prepping for our tile installation tomorrow. Here is a before pic of the bathroom.

Hall Bathroom Remodeling in Naperville, IL - JW Construction & Design ServicesHall Bathroom Remodel Naperville, IL - JW Construction & Design Services

4:00 PM – By the end of the day, we finished the bathroom tear out, installed a new bathtub and new permabase on the shower walls and the floor, roughed in plumbing and prepared the bathroom for tile installation, which will begin tomorrow. The home owners have selected a striking noir travertine for their shower area and floor. Stay tuned in – we’ll be posting progress pictures soon.

April 5, 2013

The Gustafson hall bathroom has been tiled in, plumbing fixtures have been installed and the bathroom is looking striking! We still have to install the vanity, electrical fictures, and the mirror. Here is a shot of the bath with the new noir travertine tiles – Enjoy!

Hall Bathroom Remodeling Chicago, IL with Noir travertine Tiles - JW Construction & Design Services

We will unveil the brand new hall bathroom very soon!

Please follow and like us: